Home  |  Company  |  Facilities  |  Directions  |  Brochures  |  Request Info  |  File Send
 
 
 
Engineering Design
Compliance Services
Fabrication Shop
Standard Products
Process Skids
Panel Enclosures
Custom Assemblies
Contract Manufacturing
 
 
CONTACT INFO
 
 
Phone: 973-575-3300
Fax: 973-575-5300
Toll-free: 888-305-1600

Email:
sales@c-p-s.com
techsupport@c-p-s.com
personnel@c-p-s.com

Corporate Address:
17 Spielman Road
Fairfield, NJ 07004-3409

 
 
 
 
 
 

FABRICATION CODES/STANDARDS
All work (see our EXPERIENCE) is performed in accordance with the following governing standards:

  • Underwriters Laboratories, Inc.
  • + UL508A Standard for Industrial Control Panels
  • + UL698B Control Panels and Assemblies for Use in Hazardous Locations
  • + UL698A Industrial Control Panels Relating to Hazardous Locations
  • The American Society of Mechanical Engineers (ASME)
  • + BPE BioProcess Equipment
  • + B31.1 Pressure Piping
  • + B31.3 Process Piping
  • + Section VIII Boiler & Pressue Vessel
  • Instrumentation, Systems and Automation Society (ISA):
  • + Standards and Recommended Practices for Instrumentation and Control
  • National Electrical Electrical Manufacturers Association (NEMA)
  • The Institute of Electrical and Electronic Engineers (IEEE)
  • Occupational Safety and Health Administration (OSHA)

SHOP CREW
The skilled crew of Electricians, Pipe-fitters & Welders adhere to the highest standards of workmanship, safety and quality. Much of the project work in recent years has been on HAZARDOUS AREA plant, and consequently the company is well versed in INTRINSIC SAFETY wiring and all other techniques for hazardous area equipment.

SHOP CAPABILITIES
CPS has 10,000 sq. ft of space for system fabrication, staging and testing. A two ton crane and loading dock accommodate transfers of large systems, and pickups by all sizes of trucking vehicles.

  • + Isolated SS Fabrication Area with Air Filtration
  • + Panel Layout and Assembly
  • + Skid Layout & Assembly
  • + Machine/Equipment Wiring
  • + Pneumatic & Hydraulic Systems
  • + Fully Equipped Machine Shop
  • + Painting and Welding Booths
  • + Orbital Welding
  • + Borescope Inspection
  • + Certified Welding Procedures
  • + SS Material Management
  • + Computerized Labeling/Engraving, Cutting

STAGING AND TEST CENTER
Utilities available for skid, panel and system testing are medium voltage electric, water and compressed air, clean steam, PI water and chilled water. The test area is air conditioned, bright, and connected with telemetry to fully prove each system prior to shipment and installation.

Factory Acceptance Testing (FAT) - Formal Test Documentation
Each system at CPS receives a thorough test prior to being released. Standard and custom formal test plans are available to properly document the testing process.

 
 
 